Natural Gas Allocation and Management is a system manufacture and organize for a special purpose. Pakistan have now only limited natural gas deposits according to latest survey. At Now, recoverable natural gas reserves in All Pakistan are 32.5 Trillion per Cubic Feet and Reserve to Productions i.e R / P ratio. It is fully based on current production of 3.9 Billion Cubic Feet per Day is 24 years From Now onward. Pakistan Best developments in local gas market is enlarge of natural gas share from 41 % in 1999 to 2000 to over 53 % in 2004 to 2005 in average of five years.

Federal Government of Pakistan is making huge efforts in more production in less budget. So Federal Government of Pakistan has set some major guidelines for this purpose which is follows:

Consumer Mix:

On June 30 th 2005, natural gas of Pakistan is being supplied to different categories of consumers. These consumers either connected to self-standing pipeline system or Gov pipeline system that is directly from manufacturing Companies. Main details for them is as given below:

A. On the SNGPL / SSGC System

Percentage Load

Domestic Sector15.6
Commercial Sector2.4
Fertilizer Plants5.2
Industrial Units19.4
WAPDA’s and KESC Power Plants32.5
Cement Plants1.2
Captive Power Plants4.2
CNG0.5
Sub Total (A)81

B. On Independent Network

Percentage Load

Fertilizer Plants8.5
WAPDA’s and KESC Power Plants7.2
Independent Power Plants3.3
Sub Total (B)19
Grand Total ( A+B )100

Existing Demand Management

Now, Natural gas in Pakistan demands on the system on huge winter load period and also from short supplies from E & P Management companies by the following programme:

  • Main Fertilizers plant are provided continuous gas
  • After meeting specific requirement of domestic the Power plants become gas supply
  • Commercial and Domestic Both consumers involved in continuous gas supply
  • 9 month contracts is curtailed on Gas supply to all industries otherwise can be disconnected
  • Cement plants are delivered gas on only when gas is available on basis.
 
To check out your sui gas bill process and want to view suigasebills.pk

Gas Allocation Criteria

From the official network system of Pakistan only for provision of newly gas connections for consumers. Here are some guidelines please read carefully:

  • Commercial Sector will be inspire if the sui gas is supply to consumers shortly.
  • Sui Gas supply to the consumer in every Domestic Sector going to be targeted yearly.
  • In Captive Power Sector the sui gas will supply to all consumers correctly.
  • The sponsors can also be makes an investment of Rs-/ 501 million.
  • Make sure that the gas
  • load should not be exceeded from 1.1 MMCFD.

From all issuance of allotment letter, the allotment will automatically expired:

Monthly Payment = allotment daily quantity in the MMBtu X Rs-/ 310 ( US $0.7 / MMBtu)

First month fees of commitment will be submit with in 30 days after issuance of allotment letter.

Gas allocation automatically will be expired if the fees will not be paid in the time span of 30 days.

Submitted payments will be non refundable to everyone.

Proposed Load Management Policy

For all consumers connected gas system, These are the priorities noticed by Gas Companies:

 Category of Consumers Priority  

Order

Domestic and Commercial SectorsFirst Order
Industrial Sector to proportion of their procedure of gasSecond Order
Independent Powers Plant and WAPDAThird Order
Commercial CNG Sectors and  General IndustrialFourth Order
WAPDA’s and KESC Powers PlantFifth Order
Captive Power SectorSixth Order
Category of ConsumersPriorities Order
Fertilizer PlantsFirst
Power Sector Like Wapda and IPPs.Second